Case Study
Event Kitchen for Christmas at the Spiegeltent
Kitchen Infrastructure Supplied to Christmas at the Spiegeltent
Location
Bristol and Liverpool
Requirement
Catering infrastructure support for two residencies over the festive period in Bristol and Liverpool
Supplied
Cold rooms, combi ovens, bratt pans, tabling, turbofan ovens, flight dishwashing units, jack stands, six burners
Kitchen Infrastructure Supplied to Christmas at the Spiegeltent
Location
Bristol and Liverpool
Requirement
Catering infrastructure support for two residencies over the festive period in Bristol and Liverpool
Supplied
Cold rooms, combi ovens, bratt pans, tabling, turbofan ovens, flight dishwashing units, jack stands, six burners
Christmas at the Spiegeltent has been operating in Bristol for seven years. It uses a beautiful Belgian Spiegeltent – a circular wooden temporary building adorned with mirrors and stained glass windows.
The first shows saw 200 patrons sitting down for food and some cabaret acts. Now, 1,000 guests enjoy a high-quality three-course meal and a full evening’s entertainment from some of the country’s top cabaret acts.
The event has grown to be such a success that the team behind it decided to launch a sister event in Liverpool’s Baltic Triangle in November 2019.
After working with PKL & in 2018, the Spiegeltent team chose to use us again in 2019 for the expansion to Liverpool.
The addition of Lowe’s large cold rooms – the biggest the team had ever used – proved perfect for the catering team’s delivery plans, using large Jackstands of pre-prepared starters and desserts. PKL’s kitchen and washup setup helped the small team to prepare and serve 1,200 customers a night throughout December, across two sites, smoothly and professionally.